Al Meena Tower, Sharjah-Al Masaood Building
Supply and Installation of Motion Sensors – 86 nos
Supply and installation Motion sensor in lift lobby at B1 & M (Qty: 2)
- Supply and installation Motion sensor in lift lobby at Level GF (Qty: 4)
- Supply and installation Motion sensor in lift lobby at Level 1 to 20 (Qty: 80)
- Modification of existing circuits for 26 lights in typical floors with material ( 1.5mm wire connector etc). (Qty: 20)
- Cutting and repairing of decorative gypsum ceiling (wherever required) (Qty: LS)
- Painting on repaired part of ceiling with existing colour (Qty: LS)